The project’s improvements include widening the viaduct approximately 26 feet to the north in order to make way for the Light Rail Transit and provide two standard 12-foot through lanes with a five-foot shoulder along the north side of the viaduct. The existing six-foot sidewalks on both sides of the viaduct will be maintained and the inside eastbound lane on the 1st Street at Mission Road will serve as a left turn pocket.
U.S. 101 / I-405 Gap Closure ProjectThis project consists of two bridges: the Greenleaf St. on-ramp undercrossing and the Ventura Blvd. undercrossing. Both of these are single span bridges.
Garden Grove SR-22 Freeway WideningSteve P. Rados, Inc. is a member of Granite-Myers-Rados (GMR) the joint venture team that is overhauling the SR-22.