July 17, 2009
On July 17th, 2009, Steve P. Rados, Inc. was awarded the $35,382,620 River Supply Conduit Lower Reach Unit 4 Project in Los Angeles for the Los Angeles Department of Water and Power (LADWP). This project consists of the installation of approximately 10,000 linear feet of welded steel pipe ranging in dimensions from 96 inch to 48 inch. The project also consists of numerous large, concrete structures as well as four jack and bores and a slip lining section. The majority of the project will be located on surface streets adjacent to the 5 Freeway in the vicinity of Los Feliz Blvd. in Los Angeles. Steve P. Rados, Inc. is looking forward to a successful project working with LADWP.